Skip to main content

In This Volume

  • 84 (1) If a subdivision plan is tendered for examination and approval after the expiration of 3 months after the date the survey is completed, the approving officer may require the surveyor who carried out the survey to inspect the survey and
  • (a) Be satisfied that
    • (i) all posts and monuments are in place, and
    • (ii) the survey has not been affected by an intervening survey or a registration, deposit or filing under this Act, and
  • (b) write on the plan “inspected under the Land Title Act”, with the date of the inspection and the surveyor’s signature.
  • (2) The surveyor may inspect and certify under subsection (1) before the plan is tendered for approval.
  • (3) In the event of the death or disability of the surveyor, the Surveyor General may appoint another British Columbia land surveyor to make the inspection.

1979-219-84; 2023-10-453.