Skip to main content

In This Volume

  • 336 (1) The surveyor must limit the survey to a block outline survey where the survey would accomplish the object of the special survey, but where a block outline survey would not have that effect the surveyor must make an effective survey which may be in part a complete survey and in part a block outline survey, as the surveyor thinks advisable.
  • (2) The surveyor must, on written request of the registered owner of a parcel, preferred while the survey is in progress, make a complete survey of that parcel, and the additional cost occasioned by it must be borne by the registered owner and charged against the land affected on the completion of the survey.

1979-219-336.