Skip to main content

In This Volume

  • 330 The surveyor in charge of the special survey must make the survey and plan under the guidance and instruction of the minister and within whatever period of time may be prescribed by the minister.

1979-219-330; 2003-66-35.

PRACTICE

Although this section requires that a special survey be made under the guidance and instruction of the minister, in practice the minister does not give specific instructions to the surveyor.